Pres_RediSeal

rediseal web

 RediSeal – The Industry’s First 100% Acid Soluble, High Solid, High Fluid Squeeze Pill

When drilling in high-permeable production zones, avoiding damage or plugging is critical.  But in situations where losses are seen, it’s difficult to control mud losses. That’s because there are few loss circulation material (LCM) options that will not cause damage.  Introducing RediSeal™—IOFS’s industry-first solution which, in combination with large size particle distribution, not only seals off any size sands, large fractures or micro fractures, but maintains the high compression strength necessary to hold a tight-seal throughout the drilling section.

Presenter: Eddie Daigle, Lead Technical Engineer - Drilling

Presentation Times

October 9, 2017 October 10, 2017 October 11, 2017
9:30 AM
3:30 PM
11:30 AM 10:00 AM